SIMOPS
Simultaneous Operations (SIMOPS) procedure details the actions required to prevent incidents/accidents due to the carrying out of conflicting operations.
CONTENTS
1.0 INTERNAL CONTROLS
2.0 VALIDATION
3.0 APPROVAL
4.0 PURPOSE
5.0 SCOPE
6.0 ORGANIZATION
7.0 RESPONSIBILITIES
8.0 THE OPERATING PARTY
9.0 CONSTRUCTION TEAM
10.0 CONTRACTOR
11.0 SIMOPS TECHNICAL DOSSIER & WORK PERMIT
12.0 TECHNICAL DOSSIER FOR SIMOPS
13.0 WORK PERMIT FLOW
14.0 PERMIT LOCATION BOARD
15.0 CONTROLS
16.0 PHYSICAL CONTROLS
17.0 ISOLATION CONTROLS
18.0 COMMUNICATION
19.0 KICK OFF MEETING
20.0 SIMOPS COORDINATION MEETING
21.0 OPERATIONAL RESTRICTIONS BY THE RUNNING PLANT ON PROJECTS.
22.0 CRITICAL LIFTING
23.0 EXCAVATION
24.0 CRITICAL WORK
25.0 VEHICLE ACCESS
26.0 SCAFFOLDING
27.0 PRE-COMMISSIONING & COMMISSIONING (PC&C)
28.0 EMERGENCY RESPONSE