Listed below are some examples of documents we have produced for our clients.
All of our documents are produced following detailed discussions with our clients to ensure all relevant areas are adequately addressed.
Land Transport Management Procedure
Driving is amongst the most hazardous activities carried out in the course of project execution. A comprehensive Land Transport Management Procedure will provide the actions necessary to reduce vehicle accidents and incidents.
View Document Contents
LNG Plant Operating Manual
A typical example of an Operating Manual for an LNG Plant.
View Document Contents
High Level Operating Manual (HLOM) Example
A typical example of an HLOM produced for a Slugcatcher & Condensate Stabilisation Unit.
View Document Contents
Work At Height Procedure
This procedure details the actions required to ensure that work at height can be carried out in a safe manner.
View Document Contents
Control Of Temporary Equipment
The Purpose of this procedure is to ensure that all temporary installed equipment are correctly specified, tested, inspected, installed and maintained in a safe and serviceable condition.
View Document Contents
Lockout & Tagout
Lockout & Tagout is intended to provide a safe method of work whenever service or maintenance on any piece of equipment, machine or system, or where hazardous process or product could cause injury to personnel, damage to machinery or adverse effect to the environment.
View Document Contents
SIMOPS
Simultaneous Operations (SIMOPS). This procedure details the actions required to prevent incidents/accidents due to the carrying out of conflicting operations.
View Document Contents
Occupational Health & Safety Management System
Employers have a legal responsibility to provide a safe workplace & systems of work. This also includes consulting with your workers & keeping them informed about health and safety matters.
View Document Contents
Radiography
This procedure details all of the actions required to ensure compliance with the law & the safety of all personnel on site when carrying out Radiography.
View Document Contents
Nitrogen Leak Test Procedure
This document covers the details for pressurising new piping & vessels with nitrogen & testing all gaskets/flanges/seals as well as commissioning/stroking of all in-line instrumentation, control valves & shutdown valves.
View Document Contents
Health safety & Environment Manual
The purpose of this HSE Manual is to identify the necessary controls and measures required to ensure that all employees, our clients and subcontractors work in a healthy and safe environment and to ensure that no impact on the surrounding environment occurs.
View Document Contents
Confined Space Entry Procedure
Work in confined spaces present a number of unseen risks & can be extremely hazardous. This procedure details all of the precautions required to reduce these risks to an acceptable level and allow work to be carried out safely.
View Document Contents
FPSO Maintenance Strategy
The objective of this maintenance strategy is to optimise availability & Technical Integrity, utilising minimum manning requirements whilst achieving Legislative compliance.
View Document Contents
Hydrogen Sulphide
H2S is an extremely toxic gas & exposure can be fatal. This document details the actions required to ensure the safety of personnel in an H2S environment.
View Document Contents
Electrical Isolation Of Motor Starter, Cable And Pump Motor
The purpose of this procedure is to ensure the safe isolation of electrical equipment to be worked on.
View Document Contents
Permit To Work Procedure
This procedure describes the Permit to Work system that is used to provide a coordinated & controlled safe system of work. It is intended to achieve a safe working environment by providing the control needed to identify & mitigate any hazard that would have an adverse effect on either personnel performing the job or the facilities.
View Document Contents
Hazardous Material Handling Procedure
This procedure and guidance is intended to provide a system for recording and controlling the use of all hazardous substances likely to be introduced to, or found during construction, pre-commissioning and commissioning activities on all projects
View Contents
Scaffolding
Scaffolding that is not installed, maintained & used correctly, can result in catastrophic failure. This procedure details the actions required to ensure that scaffolds provide a safe working environment for all users and are erected, modified & dismantled in a safe manner.
View Document Contents
Lifting Operations & Lifting Equipment Regulations
This procedure details the actions required to ensure the safe execution of all activities involving the use of all types of lifting appliances, as well as the use of associated lifting equipment & the requirements of personnel involved in such activities.
View Document Contents
Mechanical Completion
This procedure has been established to provide a systematic process for performing Mechanical Completion & Commissioning assurance activities.
View Document Contents
Pre Commissioning Of Pipelines
This procedure gives minimum requirements for dewatering, cleaning, drying & preservation of pipelines. These activities are termed pre-commissioning & may be necessary to prevent unacceptable internal corrosion & fluid contamination during commissioning & operation of the pipeline.
View Document Contents
Electrical Safety Procedure
The purpose of this procedure is to ensure Company Electrical Authorised Persons & Contractor Electrical Authorised Persons carry out their duties.
View Document Contents
Mechanical Completion
This procedure has been established to provide a systematic process for performing Mechanical Completion & Commissioning assurance activities.