High Level Operating Manual (HLOM) Example


Example of a High Level Operating Manual (HLOM) Slugcatcher & Condensate Stabilisation

Contents

  • Introduction

  • Purpose

  • About Unit

  • Purpose Of The Unit

  • Block Diagram Of Unit

  • Process Narrative

  • Design Basis & Underlying Theory

  • Process Description

  • Modes Of Operation

  • Description Of All Allowable Phases & Modes

  • Specific Mode Switch Diagram

  • Description Of Key Issues For Each Mode

  • Line-Up & Isolation Strategy

  • Relationship With Other Plants/Units/Operating Systems

  • Relationships With Other Process Units

  • Relationships With Utility Units

  • Relationship Sketches

  • Relationships With Feeds, Intermediates & Final Product Storage & Handling Facilities

  • High Level Power Supply Diagram

  • Table Of Feed Streams, Describing Flows, Conditions & Quality Requirements

  • Table Of Utility Requirements (Quality & Quantity)

  • Table Of Catalyst & Chemical Requirement

  • By Products & Waste Products

  • Unit Equipment List

  • Systemization Catalogue

  • Asset Register

  • Detail Isolation Requirement

  • Performance Criterion

  • Key Operating Parameters & Operating Window

  • Operating Parameters

  • Summary Heat & Material Balance For Each Operating Mode

  • Safe Operating Windows For Each Operating Mode

  • Design Throughput

  • Impact Of Change In Feed Stock Quantity & Quality

  • Design Turndown Ratio

  • Performance Control Plan

  • Process Sampling Scheme

  • Transition Procedure For Mode Switch

  • Control

  • Process Control Narrative

  • Control System

  • Alarm Description

  • Probable Causes For Alarm Excursion & Recovery Actions

  • Alarms & Trip Setting Table

  • Safeguarding

  • Process Safeguarding Narrative

  • Process Safeguarding Flow Scheme

  • Safeguarding Trips Setting Table

  • Description Of ESD System

  • Cause And Effect Diagram

  • Recovery Procedure For ESD Trips

  • Fire And Gas Systems

  • List Of Fire & Gas Detectors

  • Cause And Effect Diagram For Fire & Gas System

  • Fire Fighting Equipment

  • List Of Interlocking Valves

  • Lock Open/Lock Close Valves

  • List Of Pressure Relief Valves

  • Unit Performance & Integrity

  • Sparing Philosophy

  • Equipment Change Over Schedule

  • Availability Of Unit

  • System Effectiveness Of Unit

  • System Effectiveness Unit Throughout Lifetime

  • System Effectiveness Unit Systems

  • Strategies For Achieving System Effectiveness

  • Design System Effectiveness

  • Key Parameters For Achieving Design System Effectiveness

  • Capacity/Utility Consumption

  • Equipment Capacity

  • Utility Consumption

  • Risk

  • Short Term Risk To Operation, Prevention, Mitigation & Recovery Measures

  • Identification Of Hazardous Area

  • Degradation

  • Long Term Risks To The Operation

  • Prevention, Mitigation & Recovery Measures

  • List Of Operational Limitations Due To Material Of Construction

  • Special Areas Of Attention & Risks

  • Operator Tasks

  • Work Area Split (Inside/Outside) & Operator Rounds

  • Key Operator Tasks & Monitoring Requirements For Each Operator Position

  • Key Operator Monitoring Tasks

  • Inspection Records

  • Change History

  • Changes Made During Feed Phase

  • Changes Made During EPC Phase

  • Changes Made During Start-Up (SU) Phase

  • Changes Made During Normal Operation (No) Phase

  • Overview Of Critical HSE Aspects Of The Unit

  • Health Hazards

  • Safety (Process Safety)

  • Material Safety Data Sheet (MSDS)

  • Environmental Hazards

  • Continuous Or Intermittent Flare Streams

  • Unit Specific HSE Tasks & Activities

  • List Of Safety Critical Equipments

  • Description Of Fixed Fire Fighting Equipment

  • Control Of Open Connections To Process Equipment

  • HSE Checklist

  • Noise Contour Diagram

  • Unit Emergency Response Flow Chart

  • Pre-Incident Plans For Emergency Scenarios Rated High In Unit Safety Case

  • Plant Layout

  • Asset Work Register

  • Reference Documents

  • Design Memorandum

  • Engineering Drawings

  • Alarm & Trip Schedule

  • Safety Memorandum

  • Analytical Memorandum





Previous
Previous

Radiography

Next
Next

Mechanical Completion