Mechanical Completion
This procedure has been established to provide a systematic process for performing Mechanical Completion & Commissioning assurance activities.
The objective of this procedure is to ensure that equipment & systems have a high integrity & safe commissioning and operation. This will support an incident free work environment, hence reducing human exposure to risks, protecting the environment & assure a safe & reliable operation of the asset.
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 DEFINITION OF MECHANICAL COMPLETION
3.0 MC CERTIFICATES
4.0 MECHANICAL COMPLETION PROCESS
5.0 MC WORK PACKAGES
6.0 CONTENT OF MECHANICAL COMPLETION PACKAGE
7.0 MC INSPECTION CERTIFICATE NUMBERING CONVENTION
8.0 MC DOCUMENTATION & AS BUILDING
9.0 DEFINITION OF COMMISSIONING PROCESS
10.0 COMMISSIONING PROCESS
11.0 START-UP REVIEW
12.0 COLD COMMISSIONING
13.0 HOT COMMISSIONING
14.0 RELIABILITY/PERFORMANCE TEST
15.0 FACILITY ACCEPTANCE CERTIFICATE
16.0 INSPECTION CERTIFICATE NUMBERING
17.0 CONTENT OF COMMISSIONING PACKAGE
18.0 PUNCH HANDLING
19.0 ROLES & RESPONSIBILITIES
20.0 HANDOVER OF MECHANICAL COMPLETED & COMMISSIONED FACILITIES
21.0 REFERENCES